What is circular construction? Principles, terms and practice

Around half of Germany’s waste comes from construction. Circular construction tackles exactly this: buildings are designed so that components and materials stay in the loop. We explain the principles, the key terms and what this means for floors, walls and ceilings.
Reading time: approx. 8 minExpert knowledge from Wolf Bavaria
Grafik zirkuläres Bauen: Kreislauf aus Planen, Bauen, Nutzen und Rückbauen rund um ein Gebäude
In brief

Circular construction means planning, building, using and deconstructing buildings so that components and materials stay in the loop for as long as possible and at the highest possible quality. The building stock is seen as a materials bank: components are reused and materials are separated by type and recycled instead of being disposed of as waste at the end.

Key points at a glance
  • Construction and demolition waste accounts for around half of all waste generated in Germany: in 2024 it was about 182.8 of 362.7 million tonnes.
  • The German Circular Economy Act sets the order of priority: prevention before reuse before recycling before other recovery before disposal.
  • More than 90 per cent of mineral construction waste is recovered, but recycled building materials cover only just over 13 per cent of the demand for aggregates.
  • Germany’s National Circular Economy Strategy of December 2024 focuses on selective deconstruction, reversible connections and a digital building resource passport.
  • Whether a component is circular is decided at the design stage: reversibly connected, separable by material type, documented.

From linear to circular construction

Conventional construction usually follows a straight line: raw materials are extracted, processed, built in and, at the end of the building’s life, demolished and disposed of. Circular construction closes this line into a loop. From the design stage onwards, thought is given to how a component can later be removed, inspected and reused or used as a raw material. In Germany, the legal basis for this is the waste hierarchy of the Circular Economy Act (KrWG).

Infographic of the waste hierarchy under the German Circular Economy Act: prevention, reuse, recycling, other recovery and disposal
Circular construction targets the upper levels of the waste hierarchy.

The higher up the hierarchy a measure is, the more material and energy is retained. Circular construction therefore focuses mainly on the first three levels: retaining existing buildings, reusing components and recycling materials separated by type.

Why circular construction matters for the industry

According to data from the German Environment Agency (UBA), gross waste generation in Germany in 2024 was 362.7 million tonnes, of which around 182.8 million tonnes was construction and demolition waste. The latest monitoring report by the Initiative Kreislaufwirtschaft Bau shows a recovery rate of 90.9 per cent for mineral construction and demolition waste in 2024. That sounds good, but a large proportion of it is used as backfill or in road building and earthworks. In 2024, recycled building materials covered only 13.2 per cent of the demand for aggregates. High-quality loops, in which a material is used again at the same quality, are therefore still the exception.

Key terms in circular construction

TermMeaning
Urban miningAccording to the German Environment Agency, the integrated management of the anthropogenic stock, in other words the recovery of secondary raw materials from buildings, infrastructure and durable goods.
Design for disassemblyDesigning for deconstruction and adaptation. The principles are described in ISO 20887:2020.
Cradle to CradleDesign concept by Michael Braungart and William McDonough with a biological and a technical cycle. The certificate of the same name is available in levels from Bronze to Platinum.
Building resource passportDocumentation of the materials installed and their suitability for deconstruction over the life cycle, for example in the format developed by the DGNB.
Materials passportDigital register of a building’s materials with quantities and properties, for example via platforms such as Madaster.
Recycling and downcyclingIn recycling, a material is processed into a new raw material. In downcycling, quality is lost in the process, for example when crushed concrete is only used as fill material.

Principles of circular design

  1. Retain existing buildings: refurbish and repurpose before building new.
  2. Use reversible connections: screwing, clamping and plugging instead of gluing, casting and composite materials.
  3. Build with separable materials: select and combine materials so that they can be separated again during deconstruction.
  4. Avoid hazardous substances: only uncontaminated materials can return to the loop without problems.
  5. Document: record materials, quantities and connections in a building resource passport or materials passport.
  6. Design for adaptability: lay out floor plans and services so that future uses are possible without demolition.

Strategy, funding and certification

On 4 December 2024, the German Federal Government adopted the National Circular Economy Strategy. For construction and buildings, it includes a significant reduction in the demand for raw materials for mineral building materials, the introduction of a digital building resource passport, selective deconstruction through modular construction methods and reversible connections, and the avoidance of composite materials that cannot be recycled. A requirement to demonstrate the deconstructability of public buildings is to be examined.

Funding and certification also address the topic. The German Quality Seal for Sustainable Buildings (QNG), for example, requires a minimum proportion of recycled material in concrete for non-residential buildings. Rating systems such as that of the DGNB include criteria for deconstructability and separability.

Circular construction for floors, walls and ceilings

In interior fit-out, circularity often comes down to one question: wet or dry? A cement screed bonded to insulation, membrane and heating pipes can hardly be deconstructed into separate materials. Dry-laid systems made of boards and elements, on the other hand, can be removed again and separated by material.

  • The PhoneStar acoustic board is made of quartz sand and honeycomb cardboard and is laid dry.
  • According to the product page, PhoneStrip, made of corrugated cardboard and compacted quartz sand, can be deconstructed into separate materials, and an Environmental Product Declaration (EPD) is available for it.
  • An EPD is also available for the PowerFloor radiant heating system made of honeycomb cardboard and aluminium heat diffuser plates.

One practical example is our reference project in the district of Viersen, where around 7,000 m² of flooring with impact sound insulation and underfloor heating was installed using dry construction: Acoustic system and underfloor heating for a large circular project.

For specifiers

When choosing products, ask not only about performance values but also about deconstruction: how is the product connected, which materials does it consist of, can they be separated, and is there an EPD? This information belongs in the building resource passport. Our article Green claims: evidence, not assertions explains what to bear in mind with environmental claims in advertising.

Frequently asked questions about circular construction

What is circular construction in simple terms?

Circular construction means planning and building in such a way that, after use, components and materials can be reused or recycled as separate material types instead of ending up as waste in landfill.

What is the difference between reuse and recycling?

With reuse, a component is used again as a whole, for example a door or a beam. With recycling, the material is processed and used as a raw material for new products. Reuse ranks above recycling in the waste hierarchy.

What is urban mining?

Urban mining refers to the recovery of secondary raw materials from the existing stock, in other words from buildings, infrastructure and durable goods. The German Environment Agency describes it as the integrated management of the anthropogenic stock.

What is a building resource passport?

A building resource passport documents which materials have been installed, in what quantities and how easily they can be deconstructed. Germany’s National Circular Economy Strategy provides for its introduction, and the DGNB offers a corresponding format.

What does Cradle to Cradle mean?

Cradle to Cradle is a design concept in which products are designed so that their components remain either in a biological or in a technical cycle. The certificate is available in the levels Bronze, Silver, Gold and Platinum.

What role does dry construction play?

Dry-laid systems made of boards and elements are easier to remove and separate by material than wet-applied, bonded composite build-ups. They are therefore an important building block for floors, walls and ceilings that can be deconstructed.

Sources

  1. Kreislaufwirtschaftsgesetz (KrWG, German Circular Economy Act), Section 6 waste hierarchy.
  2. German Environment Agency (Umweltbundesamt): waste generation, data from the Federal Statistical Office, as of October 2026.
  3. Initiative Kreislaufwirtschaft Bau: 15th monitoring report on mineral construction waste, data for 2024, press release of 4 November 2026.
  4. Federal Ministry for the Environment, Climate Action, Nature Conservation and Nuclear Safety: National Circular Economy Strategy, Cabinet decision of 4 December 2024.
  5. German Environment Agency: Urban mining, topic page.
  6. German Environment Agency: Questions and answers on Cradle to Cradle.
  7. ISO 20887:2020 Sustainability in buildings and civil engineering works, Design for disassembly and adaptability.
  8. German Sustainable Building Council (DGNB): Building resource passport.
  9. Quality Seal for Sustainable Buildings (QNG): Frequently asked questions, as of October 2025.
  10. Wolf Bavaria: product pages for PhoneStar, PhoneStrip and PowerFloor, and Viersen reference project.

Further reading

Technical application

Planning a floor, wall or ceiling?

We check your build-up and find the right tested system for new build, timber construction and refurbishment. With laboratory values instead of estimates.

Read more

More sound insulation know-how