Renovating an old house: 10 things that matter for floors and ceilings

Anyone renovating an old house and installing new floors or upgrading ceilings soon comes up against old timber joists, limited build-up height and noisy neighbours. These ten points help you avoid typical mistakes and plan correctly from the start.
Reading time: approx. 8 minExpert knowledge from Wolf Bavaria
Titelgrafik Altbau sanieren: Checkliste mit 10 Punkten für Boden, Decke und Schallschutz im Bestand
In brief

Renovating an old house covers all the measures that bring an existing building up to today’s expectations for use, comfort, energy and sound insulation. For floors and ceilings, the main task is to create a level, quiet and robust build-up with limited build-up height and structural reserve, without damaging the existing construction.

Key points at a glance
  • Everything starts with a survey of the existing structure: floor type, joist condition, moisture and old pugging determine the build-up.
  • Every additional kilogram has to be carried by the old floor. Clarify the load reserve before you start planning.
  • Build-up height is often the bottleneck in existing buildings: doors, stairs and thresholds set tight limits.
  • Dry build-ups introduce no water into timber joists and can receive floor finishes without any drying time.
  • Old adhesives and floor coverings may contain hazardous substances such as asbestos. Have them tested before removal.

Old buildings have character, but they also have their quirks. When renovating an old house, floors and ceilings in particular are where high expectations of comfort and quiet meet structures that were built decades ago for very different requirements. The following checklist summarises what matters in practice.

Checklist for renovating an old house with 10 points, from surveying the structure and load reserve to sound bridges and hazardous substances
Ten points that matter for floors and ceilings in existing buildings.

1. Survey the existing structure thoroughly

Before a build-up is designed, it must be clear what it will sit on. Is it a timber joist floor, a jack arch floor, a concrete slab or a mixed construction? What condition are the joists and floorboards in, and is there any deflection, moisture damage or insect infestation? Many old floors contain pugging made of clay, slag or sand, and its weight and condition are important for further planning. Opening up the floor at an inconspicuous spot quickly provides clarity.

2. Clarify the load reserve

A new floor adds weight to the structure. A 50 mm cement screed weighs around 100 kg/m², and floor finishes, furniture and imposed loads come on top. Old timber joist floors often have only limited reserves for this. Have the load-bearing capacity assessed by a structural engineer before deciding on a build-up. Lightweight dry build-ups, or replacing old, heavy pugging with lighter materials, can create some leeway.

3. Measure the available build-up height

In existing buildings, the available height is almost always tight. Doors still need to close, stair risers must stay the same height, and transitions to neighbouring rooms, balconies or floor-to-ceiling windows must not create trip hazards. Before planning, measure the maximum possible build-up height at every critical point. There are renovation build-ups that need very little height. On our page Dry screed for renovation you will find solutions from 15 mm build-up height on timber joist floors, and from around 54 mm with underfloor heating. Some examples from our tested system build-ups, measured in the test facility:

Build-upBuild-up heightRwLn,w
Timber joist floor BHG 1.4 with laminate15 mm52 dB60 dB
Timber joist floor with pugging BHA 1.253.5 mm70 dB43 dB
Timber joist floor BHG 1.10130 mm66 dB56 dB
Timber joist floor BHG 1.10 with suspended ceiling168 mm84 dB30 dB
Concrete floor BM 1.6.237 mm65 dB45 dB

4. Set the acoustic target

Whether sound insulation requirements apply to a renovation, and which ones, depends on the scope of the work, whether it needs approval and on regional building law. For alterations to buildings completed before 1 July 2016, the German standard DIN 4109-1 contains a separate rule: an impact sound pressure level of L′n,w ≤ 53 dB is then permitted for separating floors between flats. In England and Wales, Approved Document E sets the requirements for separating floors, including for material changes of use such as conversions into flats; its values are expressed as standardised levels and cannot be compared one to one with DIN figures. Regardless of any legal obligation, the target should be agreed in concrete terms, for example as a value for airborne and impact sound. Background information can be found in our article DIN 4109 explained.

5. Build dry instead of adding water

Wet screeds bring large amounts of water into the building, which then has to dry out again. In timber joist floors this moisture can damage joists and boards, and it often takes weeks before the screed is ready for floor finishes. Dry screeds made of boards are laid without water and can receive finishes quickly. This is a particular advantage in occupied homes. You can read what dry screed can do and where its limits lie in What is dry screed?.

6. Level the substrate

Old floorboards are rarely level. Differences in height are evened out with a dry levelling fill or grit, on which the dry screed is then laid. A fill also adds mass to the floor, which benefits impact sound insulation. Loose boards are refixed beforehand so that nothing creaks, and a separating layer prevents the fill from trickling through gaps into the joist void.

7. Avoid sound bridges from the outset

Even the best build-up loses its effect if it is rigidly connected to walls, door frames or pipes. Perimeter edge strips belong at every wall and every penetration, heating and water pipes are given a resilient sleeve, and skirting boards are fixed to the wall only. Our article What is acoustic decoupling? explains why this matters so much.

8. Plan services and underfloor heating early

A renovation is the best opportunity to reorganise services and retrofit underfloor heating. Dry radiant heating systems need little build-up height and respond quickly. Our PowerFloor radiant heating, for example, has a build-up height of just 20 mm and can both heat and cool. Plan pipe routing, manifolds and cable runs early so that no pipe later penetrates the build-up. Find out more in our article Retrofitting dry underfloor heating.

9. Consider fire safety, approvals and listed status

In Germany, the state building regulations set fire resistance requirements for floors in multi-occupancy buildings, depending on the building class. What counts is the entire floor build-up, not just a single material. Also check whether the work requires approval and whether the building is listed. For listed buildings, reversible solutions that can be removed again are often welcomed.

10. Test for hazardous substances before removal

In older buildings, floor coverings, adhesives and insulation materials may contain hazardous substances. Well-known examples are asbestos-containing floor tiles and adhesives, and tar-based parquet adhesives containing PAHs. Whether a material is contaminated cannot be reliably identified with the naked eye. A laboratory test of a material sample provides certainty. In Germany, work on asbestos-containing materials is governed by TRGS 519, and in the UK by the Control of Asbestos Regulations 2012; in both cases it belongs in the hands of competent specialist contractors.

Practical tip

With our dry screed calculator you can find a suitable build-up for your floor, your build-up height and your acoustic target in just a few steps. For timber joist floors, our article Soundproofing a timber joist floor is also worth a look.

Frequently asked questions about renovating an old house

How much build-up height does a new floor need in an old house?

That depends on the substrate, the acoustic target and the heating. Dry renovation build-ups need considerably less height than a wet screed on insulation. On timber joist floors, tested build-ups are possible from 15 mm, and from around 54 mm with underfloor heating.

Can you pour screed onto an old timber joist floor?

Technically it is possible, but wet screed is heavy and brings a lot of water into the timber structure. The load-bearing capacity must be checked first. In existing timber joist floors, dry screeds are usually the gentler solution.

Does a renovation have to comply with DIN 4109?

In Germany, that depends on the scope of the work, whether it needs approval and on regional building law. For alterations to buildings completed before 1 July 2016, DIN 4109-1 permits an impact sound pressure level of up to 53 dB for separating floors between flats. In England and Wales, Approved Document E applies instead. It makes sense to agree a specific acoustic target.

What is a trickle protection layer?

A trickle protection layer is a separating layer, for example made of paper or fleece, that is laid over floorboards or sheathing. It prevents loose fill from trickling through gaps into the joist void.

Is underfloor heating worthwhile in an old house?

Often yes, especially in combination with a heat pump, because radiant heating systems work with low flow temperatures. Dry systems can be retrofitted with a low build-up height and without screed drying time.

How can I tell if a floor covering contains asbestos?

Not reliably with the naked eye. Older floor tiles and black adhesives are particularly suspect. Only a laboratory analysis of a material sample gives certainty. In Germany, TRGS 519 reserves work on asbestos-containing materials for competent specialist contractors.

Sources

  1. DIN 4109-1:2018-01 Sound insulation in buildings, Part 1: Minimum requirements, Table 2 with footnotes. DIN Media.
  2. TRGS 519 Asbestos: demolition, remediation or maintenance work. Committee on Hazardous Substances, Federal Institute for Occupational Safety and Health (BAuA).
  3. Model Building Code (MBO) of the German Conference of Building Ministers and the building regulations of the German federal states, each in the current version.
  4. Wolf Bavaria: Dry screed for renovation, solutions page for old buildings, timber joist and concrete floors.
  5. Wolf Bavaria: PowerFloor radiant heating product page.

Further reading

Technical application

Planning a floor, wall or ceiling?

We check your build-up and find the right tested system for new build, timber construction and refurbishment. With laboratory values instead of estimates.

Read more

More sound insulation know-how